Was this page helpful?

Scheduler

     

    Scheduler overloaded

    Review details problem

    You have an error in the NMC Management Console:
    ERR: scheduler overloaded Scenario XXX.

    Solution(s)

    The "scheduler overloaded" message displayed in the NMC indicates that the scheduler is overloaded.
    You have to adjust/tune the execution perdiod of your scenarios on that probe.

    You can also check if the timeout configured in the WaitWnd functions are not too long.

     

    See also

    Was this page helpful?
    Tag page (Edit tags)
    • No tags
    Page statistics
    2482 view(s), 3 edit(s) and 3937 character(s)

    Comments

    You must login to post a comment.

    Attach file

    Attachments